Customization: | Available |
---|---|
Material: | Stainless Steel |
Structure: | Double Cylinder |
Still deciding? Get samples of US$ 151.5/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product features | 1.Pipeline port is set with a flat surface, which enables a more firm fixation of connector and improves piping processing quality. |
2.By adopting a special-shaped seal ring and positioner, 270° swing angle of small vane type is realized for the first time. | |
3.The installation position of magnetic switch can be set freely by user, and magnetic switch can be fixed at any position in the circumferential direction. |
Bore size | 10 | 15 | 20 | 30 | 40 | ||
Fluid | Air(NO-lube) | ||||||
Max.Operating pressure | 0.7Mpa | 1.0Mpa | |||||
Min.Operating pressure | 0.2Mpa | 0.15Mpa | |||||
Ambient and fluid temperature | 5~60ºC(No freezing) | ||||||
Rotation time adjustment range(s/90°) | 0.03~0.3 | 0.04~0.3 | 0.07~0.5 | ||||
Allowable kinetic energy(J) |
Single vane | without cushion | 0.00015 | 0.00025 | 0.0004 | 0.015 | 0.03 |
with cushion | 0.001 | 0.003 | 0.02 | 0.04 | |||
Double vane | 0.0003 | 0.0012 | 0.0033 | 0.02 | 0.04 | ||
Shaft load(N) | Allowable radial load | 15 | 15 | 25 | 30 | 60 | |
Allowable thrust load | 10 | 10 | 20 | 25 | 40 | ||
Port size | Side ported | M3X0.5 | M5X0.8 | ||||
Axial ported | |||||||
Angle adjustable range | Single vane | 0~230° | 0~240° | 0~230° | |||
Double vane | 0~90° |
Model | A | B | C | D | E(g6) | F(h9) | G1 | G2 | J | K | L | M | N | P | Q1 | Q2 | Q3 | R | ||
90° | 180° | 270° | ||||||||||||||||||
CRB2BW10-_S | 29 | 15 | 8 | 14 | 4-0.004/-0.012 | 9 0/-0.036 | 3 | 1 | 5 | 9 | 0.5 | 5 | 25 | 24 | M3 (6) |
3.4 (5.5) |
/ | M5 | M3 | |
CRB2BW10-_SE | 8.5 | 9.5 | M3 | |||||||||||||||||
CRB2BW15-_S | 34 | 20 | 9 | 18 | 5-0.004/-0.012 | 12 0/-0.043 | 4 | 1.5 | 6 | 10 | 0.5 | 5 | 25 | 29 | M3 (10) |
3.4 (6) |
M3 (15) |
M5 | M3 | |
CRB2BW15-_SE | 11 | 10 | M3 | |||||||||||||||||
CRB2BW20-_S | 42 | 29 | 10 | 20 | 6-0.004/-0.012 | 14 0/-0.043 | 4.5 | 1.5 | 7 | 10 | 0.5 | 9 | 25 | 36 | M3 (13.5) |
3.4 (11) |
M3 (7.5) |
M5 | ||
CRB2BW20-_SE | 14 | 13 | ||||||||||||||||||
CRB2BW30-_S | 50 | 40 | 13 | 22 | 8-0.005/-0.012 | 16 0/-0.043 | 5 | 2 | 8 | 12 | 1 | 10 | 25 | 43 | M3 (18) |
3.4 (16.5) |
M3 (10) |
M5 | ||
CRB2BW30-_SE | 15.5 | 14 |
Model | A | B | C | D | E(g6) | F(h9) | G | K | L | M | N | P | Q | R | Y | ||
90° | 180° | 270° | |||||||||||||||
CDRB2BW10-_S | 29 | 15 | 29 | 14 | 4 | 9 | 3 | 9 | 0.5 | 10 | 25 | 24 | M3X0.5 deep5 | M5X0.8 | M3X0.5 | 18.5 | |
CDRB2BW15-_S | 34 | 20 | 29 | 18 | 5 | 12 | 4 | 10 | 0.5 | 15 | 25 | 29 | M3X0.5deep5 | M5X0.8 | M3X0.5 | 18.5 | |
CDRB2BW20-_S | 42 | 29 | 30 | 20 | 6 | 14 | 4.5 | 10 | 0.5 | 20 | 25 | 36 | M4X0.7deep7 | M5X0.8 | 25 | ||
CDRB2BW30-_S | 50 | 40 | 31 | 22 | 8 | 16 | 5 | 12 | 1 | 30 | 25 | 43 | M5X0.8deep10 | M5X0.8 | 25 |
Model | A | B | C | D | E(g6) | F(h9) | G | H | K | L | M | N | P | Q | R | |||
90° | 100° | 180° | 270° | |||||||||||||||
CRB2BWU10-_S | 29 | 15 | 19.5 | 14 | 4 | 9 | 3 | 3 | 9 | 0.5 | 10 | 25 | 24 | M3X0.5deep6 | M5X0.8 | / | M5X0.8 | M3X0.5 |
See graph | / | |||||||||||||||||
CRB2BWU15-_S | 34 | 20 | 21.2 | 18 | 5 | 12 | 4 | 3.2 | 10 | 0.5 | 15 | 25 | 29 | M3X0.5deep5 | M5X0.8 | / | M5X0.8 | M3X0.5 |
CRB2BWU15-_D | M3X0.5 | / | ||||||||||||||||
CRB2BWU20-_S | 42 | 29 | 10 | 20 | 6 | 14 | 4.5 | 4 | 10 | 0.5 | 20 | 25 | 36 | M4X0.7deep7 | M5X0.8 | / | M5X0.8 | |
CRB2BWU20-_D | M5X0.8 | / | ||||||||||||||||
CRB2BWU30-_S | 50 | 40 | 13 | 22 | 8 | 16 | 5 | 5 | 12 | 1 | 30 | 25 | 43 | M5X0.8deep10 | M5X0.8 | / | M5X0.8 | |
CRB2BWU30-_D | M5X0.8 | / |
Installation and instruction |
1. As load is changing during working,a cylinder with sufficient output power should be selected |
2.Under high temperature or corrosive conditions,the corresponding high temperature resistant or corrosion resistant cylinder should be selected. | |
3.In the case of high humidity dust,or water droplets and welding slag,the necessary protective measures for cylinder should be taken. | |
4.Must clean up the dirt in the pipeline before 0ylinder is connected,in order to keep the inside cleanness of cylinders. | |
5.The medium used by Cylinder shall be filtered by filter element (greater than 40μm)before use. |
|
6.Because the front cover and piston of the cylinder are short,the general stroke cannot be too large. |
|
7.Anti-freezing measures shall be taken under low temperature environment, in order to prevent moisture from freezing in the system. | |
8.Please avoid side load as much as possible during the working process in order to maintain the nonnal operation and working life of the cylinder. |
|
lf cylinder was leaved unused for long time, watch out to the rusty surface and install dust plug at inlet and outlet. NOTE: DO NOT TAKE DOWN THE FRONT COVER AND BACK COVER. |